I have all the tapes captured that I could get good audio off of

July 30, 2008

Tags: , , — jonny @ 1:56 am

now I’m going to go back through the tapes and get the ones with glitches. Maybe it’s my camera. But as Carson pointed about his tools they may be malfunctioning be cause they are so new… LOL

Looks like I want to spend all my time on JBinNC. I think I may have something like 300 tiles left to manufacture. They are all little 32×32 pixel squares. For the most part all the animations are done. I still need to work on the little version of the protagonist. Which is to say the little character before it gets any power ups. I used the fetus as a bad guy already… After the smalll sized protagonist and the zillions of tiles are done I’d like to re-visit the backgrounds and throw in some high res versions of the baddies and maybe a few shand. After that the last step will be to make sure each board has the right music and backgrounds.

then I’ll be done! … I think

i think almost all of the animation is done for JB in NC

July 28, 2008

Tags: , — jonny @ 11:17 pm

I have 3 bad guys left to animate. two are straight forward-ish. the third will take some imagination. Speaking of thirds, i think i have about a third of the protagonist animations done. it might take about 8 more frames.

All the bonuses are done…blah blah

the music is basically done

the sounds are done

the backgrounds could be considered done

the animations are as stated above

the foreground textures are in infancy, but I think I have enough raw materials for those

Powered by WordPress