List 4: Deadlines
June 28, 2008
Okay this is the hard one - deadlines.
To be honest I’m not sure I have the slightest clue this will be even remotely comprehensive. PLEASE point out it’s many imperfections and oversights.
After August 3rd:
any orders for items - perfume, catalogues, arcades, posters, architectural models - will need to be made and delivered.
By August 3rd, 2008:
Fringe should be returned to its original state.
Lee, Amy and Skye will be doing this. It should be something to see. Think Normandy.
The scaffolding must be returned.
Anything not given away or sold must be disposed of at the dump. Amy wants all of the 2×4s and 2×6s and facing materials for her loft. I reckon the only thing we’ll really need to throw out is the hundreds of hours of work Keturah and Carol-Anne are investing in the project. Sucks to be them.
We’ll need a truck to do these two things, so I’ll rent one and need to return it.
Somehow the popcorn machine is returned to SF. Hopefully a truck rental is not required. Maybe Carol-Anne can be bribed.
July 27th:
Jackie flies home
July 20th-26th:
Lee and Jackie usher at the theater 1pm to 9pm every day.
Skye and Amy have lots of fun in LA, occasionally stopping by the Morgellon to taunt Lee and Jackie.
Jackie learns to either love or loathe conceptual art. This could go either way depending on how she feels about being bored, lonely and sweaty.
July 20th:
Most everyone flies or drives home.
Before the 1pm opening of the Morgellon, most everything is taken out of the production center, IT office and tool storage.
July 19th:
Jackie is picked up at the airport.
The theater is completed.
Air con is installed.
The lobby is completed.
The concession stand is completely stocked with soda, candy, embroidered clothing, arch. model, rings, perfume, digital catalogues, hard back catalogues, calendars, CDs, DVDs, thumb drives, broaches.
Catalogues are completed and running.
Menus are installed and lit.
Glossies are completed and signed by crew.
CDs and DVDs and thumb drives are completed and ready to be loaded that night.
Days 1-6 are edited. Day 7 is being edited.
Soundtrack is complete.
The outdoor theater is set-up and tested.
Stuff is sold.
Fortunes are made, careers launched, but hearts broken.
July 18th:
Theater seats are picked up.
Seats are secured.
Screen is painted white.
Projector and sound system are working in the theater.
Network is tested to ensure we can insert the end of the movie seamlessly.
Popcorn machine is running.
Popcorn bags are screen printed.
Candy boxes are screen printed.
Perfume is belly banded.
Concession stand is installed.
Hard-bound catalog is completed.
Digital catalogue is completed.
July 17th:
Arcades are complete.
Install the Morgellon sign on top of Fringe’s overhang.
Install the Coming Soon sign on top of Fringe’s overhang.
Decorate the portholes.
July 16th:
Theater is decorated.
Lobby is decorated.
Curtains are hung.
July 15th:
Wall is completed.
Doors are installed.
Exit signs are installed.
July 14th:
July 13th:
Ceiling is completed.
Chandeliers and sconces are installed.
Risers are built.
July 12th, 6pm-9pm:
Opening party is videotaped and edited.
oRSo performs.
Hoodies are distributed.
Erin arrives.
July 9th-12th:
Carol-Anne, Keturah-Anne, David, Marcella, Elise, Phil, Libby, Stel arrive.
Confessional is built.
Network is installed.
Editing station is installed.
Log/capture station is installed.
Audio editing station is installed.
Recording studio is installed and sound-proofed.
Webcams are installed.
Time lapse is installed.
Gallery is decorated for opening.
Arcades are started.
Costco run is made - water and peanut butter are purchased.
IT office is installed.
July 8th:
Lee, Alex, Skye, Amy, Jonny and Carson arrive.
Truck from SF is unloaded.
Gear is picked up from Steve DJ.
Gear is picked up from Carthay.
Scaffold is picked up.
July 7th:
pick up tiles and carson’s tools
pick up Alex’s gear
pick up Terry’s concession stand and menus and wood
pick up ali’s tent and sweat shirts
pick up Kathryn’s suits
pick up from David?
pick up Skye’s stuff
pick up Adi popcorn
pick up elise hot dogger
Drive to LA
July 5th:
Susan reminds Jose about our reserved Hollywood parking
Lee books the scaffolding.
July 3rd:
Calendars distributed.
June 30th:
Calendar to printers.
June 29th:
Calendar completed.
June 28th:
All materials for calendar submitted.